{"id":400,"date":"2022-01-25T11:11:03","date_gmt":"2022-01-25T11:11:03","guid":{"rendered":"https:\/\/www.cybermedian.com\/id\/?p=400"},"modified":"2025-02-18T12:44:21","modified_gmt":"2025-02-18T04:44:21","slug":"pert-chart-for-project-management-with-online-examples","status":"publish","type":"post","link":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/","title":{"rendered":"Diagram PERT untuk Manajemen Proyek dengan Contoh Online"},"content":{"rendered":"<p class=\"graf graf--p graf-after--h3\" id=\"c897\">Diagram Program Evaluation Review Technique (PERT) adalah alat manajemen proyek yang memberikan representasi grafis dari garis waktu proyek untuk memecah tugas-tugas individu dari proyek untuk analisis.<\/p>\n<p class=\"graf graf--p graf-after--p\" id=\"adb7\">Diagram PERT menunjukkan setiap tugas dalam proyek sebagai sebuah simpul. Ketergantungan antara tugas (misalnya, di mana satu tugas memerlukan tugas lain untuk diselesaikan sebelum dapat dimulai) ditunjukkan dengan jelas melalui interkoneksi antara simpul tugas. Ini juga menunjukkan informasi waktu untuk setiap tugas yang mirip dengan metode jalur kritis (CPM) yang mengidentifikasi jalur terpanjang melalui proyek, dan oleh karena itu waktu minimum untuk proyek diselesaikan.<\/p>\n<h4 class=\"graf graf--h4 graf-after--p\" id=\"76cb\">Tujuan Diagram PERT<\/h4>\n<p class=\"graf graf--p graf-after--h4\" id=\"263e\">Manajer proyek dapat menggunakan diagram PERT untuk:<\/p>\n<ul class=\"postList\">\n<li class=\"graf graf--li graf-after--p\" id=\"1d27\">menetapkan jadwal realistis untuk penyelesaian proyek<\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"a4be\">memastikan fokus tetap pada tugas-tugas yang paling kritis untuk jalur kritis\u2014karena jalur tersebut mengarah pada waktu minimum yang dibutuhkan proyek, setiap keterlambatan pada tugas-tugas ini akan mengakibatkan keterlambatan pada keseluruhan proyek<\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"a6bc\">mengidentifikasi tugas yang perlu dipersingkat jika waktu keseluruhan proyek perlu dikurangi<\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"deb6\">mengidentifikasi tugas yang dapat dilakukan secara bersamaan<\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"df87\">mengidentifikasi waktu luang di mana tugas tertentu tidak terlalu kritis terhadap tenggat waktu keseluruhan.<\/li>\n<\/ul>\n<h4 class=\"graf graf--h4 graf-after--li\" id=\"d844\">Diagram PERT yang Ditingkatkan dengan Visual Paradigm<\/h4>\n<p class=\"graf graf--p graf-after--h4\" id=\"3564\">Diagram PERT tradisional adalah alat manajemen proyek yang digunakan untuk menjadwalkan, mengorganisir, dan mengoordinasikan tugas dalam sebuah proyek.<a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/www.visual-paradigm.com\/features\/enhanced-pert-chart\/\" href=\"https:\/\/www.visual-paradigm.com\/features\/enhanced-pert-chart\/\" rel=\"noopener\" target=\"_blank\">Alat Diagram PERT yang Ditingkatkan<\/a>menambahkan empat fitur tambahan untuk mengintegrasikan dengan berbagai blok bangunan Visual Paradigm. Anda dapat melakukan semua ini dalam pemodel Diagram PERT yang Ditingkatkan.<\/p>\n<ol class=\"postList\">\n<li class=\"graf graf--li graf-after--p\" id=\"696e\">Pemilihan Orang yang Bertanggung Jawab (mengaitkan tugas dengan orang yang bertanggung jawab)<\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"4603\">RACI berbasis Tugas (Bertanggung Jawab\u200a\u2014\u200aBertanggung Jawab\u200a\u2014\u200aKonsultasi\u200a\u2014\u200aInformasi)<\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"5091\">Tugas ke Manajer Tugas (Visual Paradigm Tasifier)<\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"74be\">RACI Otomatis di Manajer Tugas<\/li>\n<\/ol>\n<figure class=\"graf graf--figure graf-after--li\" id=\"726f\"><img class=\"graf-image\" data-height=\"658\" data-image-id=\"0*hDYX0zZzNiUqXLf6.png\" data-is-featured=\"true\" data-width=\"1170\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0hDYX0zZzNiUqXLf6.png\"\/><figcaption class=\"imageCaption\">Diagram PERT yang Ditingkatkan\u200a\u2014\u200aVisual Paradigm<\/figcaption><\/figure>\n<h3 class=\"graf graf--h3 graf-after--figure\" id=\"3f1a\">Penugasan Orang yang Bertanggung Jawab<\/h3>\n<p class=\"graf graf--p graf-after--h3\" id=\"c1cb\">Jika Anda menggunakan solusi tim kami seperti VP Online atau Teamwork Server, Anda dapat memilih anggota tim untuk menjadi orang yang bertanggung jawab atas tugas dalam Diagram PERT. Ini membuat perencanaan tugas menjadi jauh lebih mudah dan efektif.<\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"4b2c\"><img class=\"graf-image\" data-height=\"601\" data-image-id=\"0*aW7tPKxTvtMSan2Z.png\" data-width=\"1170\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0aW7tPKxTvtMSan2Z.png\"\/><figcaption class=\"imageCaption\">Diagram PERT\u200a\u2014\u200aPenugasan Orang yang Bertanggung Jawab<\/figcaption><\/figure>\n<h3 class=\"graf graf--h3 graf-after--figure\" id=\"a6f7\">RACI per tugas<\/h3>\n<p class=\"graf graf--p graf-after--h3\" id=\"6247\">Selain siapa yang bertanggung jawab atas tugas mana, Anda dapat lebih lanjut menggambarkan peran rinci (Bertanggung Jawab\u200a\u2014\u200aBertanggung Jawab\u200a\u2014\u200aKonsultasi\u200a\u2014\u200aInformasi) dari tugas tertentu. Jika Anda menyinkronkan Diagram PERT ke manajer tugas, Anda akan melihat tugas-tugas muncul dalam daftar anggota yang \u201cBertanggung Jawab\u201d untuk itu. Dan, ketika anggota telah menyelesaikan tugas, tugas tertentu tersebut akan ditampilkan, sesuai dengan skema aliran RACI dari anggota yang bersangkutan.<\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"7176\"><img class=\"graf-image\" data-height=\"658\" data-image-id=\"0*-wuFYF5rfFlsTQh7.png\" data-width=\"1170\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0-wuFYF5rfFlsTQh7.png\"\/><\/figure>\n<h3 class=\"graf graf--h3 graf-after--figure\" id=\"252f\">Hasilkan tugas dari diagram PERT<\/h3>\n<p class=\"graf graf--p graf-after--h3\" id=\"d97c\">Setelah Anda selesai membuat dasar jadwal dengan Diagram PERT yang Ditingkatkan, Anda dapat menyinkronkan tugas-tugas dari PERT ke manajer tugas. Tugas akan dihasilkan secara otomatis, dan ditugaskan kepada anggota yang bersangkutan. Anda dapat melihatnya baik di Tampilan Proyek atau Tampilan Anggota.<\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"c6b6\"><img class=\"graf-image\" data-height=\"658\" data-image-id=\"0*nn4rnP2TO7qK8krb.png\" data-width=\"1170\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0nn4rnP2TO7qK8krb.png\"\/><figcaption class=\"imageCaption\">Diagram PERT ke Manajer Tugas\u200a\u2014\u200aVisual Paradigm<\/figcaption><\/figure>\n<h3 class=\"graf graf--h3 graf-after--figure\" id=\"4a08\">Eksekusi diagram PERT dalam aksi<\/h3>\n<p class=\"graf graf--p graf-after--h3\" id=\"d9f9\">Seperti yang disebutkan, ketika Anda menyinkronkan tugas dalam Diagram PERT ke Manajer Tugas, Anda hanya akan melihat tugas yang ditambahkan kepada anggota yang bertanggung jawab atasnya pada awalnya. Tetapi ketika tugas telah ditandai selesai oleh seorang anggota, tugas tersebut akan mengalir ke anggota lain yang Bertanggung Jawab \/ Konsultasi \/ Informasi sesuai dengan skema aliran tugas.<\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"2988\"><img class=\"graf-image\" data-height=\"754\" data-image-id=\"0*RqlQRyFkQ5jxQofy.png\" data-width=\"860\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0RqlQRyFkQ5jxQofy.png\"\/><figcaption class=\"imageCaption\">Diagram PERT dengan Alur Kerja Otomatis dan Manajemen Tugas<\/figcaption><\/figure>\n<h4 class=\"graf graf--h4 graf-after--figure\" id=\"d4e9\">Contoh PERT Buat Sendiri<\/h4>\n<p class=\"graf graf--p graf-after--h4\" id=\"b228\">Klik dan coba sendiri dengan Visual Paradigm<a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/\" rel=\"noopener\" target=\"_blank\">Contoh Online<\/a><\/p>\n<p class=\"graf graf--p graf-after--p\" id=\"91ac\"><a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/project-management\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/project-management\/\" rel=\"noopener\" target=\"_blank\">Manajemen Proyek<\/a><\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"0942\"><img class=\"graf-image\" data-height=\"489\" data-image-id=\"0*oewKfxFrBBFFiPC7.png\" data-width=\"1087\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0oewKfxFrBBFFiPC7.png\"\/><\/figure>\n<p class=\"graf graf--p graf-after--figure\" id=\"55e5\"><a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/tasks-with-milestones\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/tasks-with-milestones\/\" rel=\"noopener\" target=\"_blank\">Tugas dengan Tonggak<\/a><\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"153e\"><img class=\"graf-image\" data-height=\"389\" data-image-id=\"0*9Tlto3Q5X_9mYlP9.png\" data-width=\"1374\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/09Tlto3Q5X_9mYlP9.png\"\/><\/figure>\n<p class=\"graf graf--p graf-after--figure\" id=\"2c36\"><a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/build-a-website\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/build-a-website\/\" rel=\"noopener\" target=\"_blank\">Membangun Situs Web<\/a><\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"e23d\"><img class=\"graf-image\" data-height=\"374\" data-image-id=\"0*QNF4nTFthOzopU0A.png\" data-width=\"813\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0QNF4nTFthOzopU0A.png\"\/><\/figure>\n<p class=\"graf graf--p graf-after--figure\" id=\"f685\"><a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/sdlc-template\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/sdlc-template\/\" rel=\"noopener\" target=\"_blank\">Template SDLC<\/a><\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"5e9d\"><img class=\"graf-image\" data-height=\"618\" data-image-id=\"0*nz4vjfkM6Ps6ChvN.png\" data-width=\"1203\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0nz4vjfkM6Ps6ChvN.png\"\/><\/figure>\n<p class=\"graf graf--p graf-after--figure\" id=\"d7d9\"><a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/prepare-project-proposal\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/prepare-project-proposal\/\" rel=\"noopener\" target=\"_blank\">Siapkan Proposal Proyek<\/a><\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"e4a2\"><img class=\"graf-image\" data-height=\"205\" data-image-id=\"0*Mza8VX0t1o8HMKWC.png\" data-width=\"1259\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0Mza8VX0t1o8HMKWC.png\"\/><\/figure>\n<p class=\"graf graf--p graf-after--figure\" id=\"2e97\"><a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/develop-pert-chart-from-structure-task-list\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/develop-pert-chart-from-structure-task-list\/\" rel=\"noopener\" target=\"_blank\">Kembangkan Diagram PERT dari Daftar Tugas Terstruktur<\/a><\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"e311\"><img class=\"graf-image\" data-height=\"653\" data-image-id=\"0*zeCnBWaNJL0I-u4m.png\" data-width=\"1364\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0zeCnBWaNJL0I-u4m.png\"\/><\/figure>\n<p class=\"graf graf--p graf-after--figure\" id=\"c8e4\"><a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/enhanced-pert-chart-for-task-management-automation\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/enhanced-pert-chart-for-task-management-automation\/\" rel=\"noopener\" target=\"_blank\">Diagram PERT yang Ditingkatkan untuk Otomatisasi Manajemen Tugas<\/a><\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"7978\"><img class=\"graf-image\" data-height=\"479\" data-image-id=\"0*enm9lfzePeL1xrPG.png\" data-width=\"1076\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0enm9lfzePeL1xrPG.png\"\/><\/figure>\n<p class=\"graf graf--p graf-after--figure\" id=\"0a91\"><a class=\"markup--anchor markup--p-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/software-development-example\/\" href=\"https:\/\/online.visual-paradigm.com\/diagram-examples\/pert-chart\/software-development-example\/\" rel=\"noopener\" target=\"_blank\">Contoh Pengembangan Perangkat Lunak<\/a><\/p>\n<figure class=\"graf graf--figure graf-after--p\" id=\"90f3\"><img class=\"graf-image\" data-height=\"630\" data-image-id=\"0*jRo6WmIp6IJBvPP9.png\" data-width=\"1080\" decoding=\"async\" src=\"https:\/\/www.cybermedian.com\/id\/wp-content\/uploads\/sites\/17\/2022\/02\/0jRo6WmIp6IJBvPP9.png\"\/><\/figure>\n<h4 class=\"graf graf--h4 graf-after--figure\" id=\"761b\">Artikel Terkait Visual Paradigm Online tentang Diagram PERT<\/h4>\n<ul class=\"postList\">\n<li class=\"graf graf--li graf-after--h4\" id=\"7738\"><a class=\"markup--anchor markup--li-anchor\" data-href=\"https:\/\/www.visual-paradigm.com\/support\/documents\/vpuserguide\/4370\/4373_pertchart.html\" href=\"https:\/\/www.visual-paradigm.com\/support\/documents\/vpuserguide\/4370\/4373_pertchart.html\" rel=\"1f2dcd47 x_url noopener\" target=\"_blank\">Diagram PERT di Visual Paradigm<\/a><\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"5017\"><a class=\"markup--anchor markup--li-anchor\" data-href=\"https:\/\/online.visual-paradigm.com\/tutorials\/pert-chart-tutorial\/\" href=\"https:\/\/online.visual-paradigm.com\/tutorials\/pert-chart-tutorial\/\" rel=\"noopener\" target=\"_blank\">Tutorial Diagram PERT<\/a><\/li>\n<li class=\"graf graf--li graf-after--li\" id=\"8775\"><a class=\"markup--anchor markup--li-anchor\" data-href=\"https:\/\/www.visual-paradigm.com\/support\/documents\/vpuserguide\/4370\/4373\/86388_drawingapert.html\" href=\"https:\/\/www.visual-paradigm.com\/support\/documents\/vpuserguide\/4370\/4373\/86388_drawingapert.html\" rel=\"noopener\" target=\"_blank\">Bagaimana Cara Menggambar Diagram PERT?<\/a><\/li>\n<li class=\"graf graf--li graf-after--li graf--trailing\" id=\"ad26\"><a class=\"markup--anchor markup--li-anchor\" data-href=\"https:\/\/circle.visual-paradigm.com\/category\/system-design-development\/pert-chart\/\" href=\"https:\/\/circle.visual-paradigm.com\/category\/system-design-development\/pert-chart\/\" rel=\"noopener\" target=\"_blank\">Diagram PERT<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>PERT diagrams show each task in a project as a node. Dependencies between tasks (for example, one task needs to be completed before another can be started) can be clearly shown through connections between task nodes. It also shows time information for each task, similar to the critical path approach (CPM), which determines the longest path for a project and thus the minimum time for the project to complete.<\/p>\n","protected":false},"author":1,"featured_media":2453,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","footnotes":""},"categories":[7],"tags":[52,63,62,53],"class_list":["post-400","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pmbok-project-management","tag-cn-done","tag-es-done","tag-ja-done","tag-tw-done"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Diagram PERT untuk Manajemen Proyek dengan Contoh Online - Media Maya<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Diagram PERT untuk Manajemen Proyek dengan Contoh Online - Media Maya\" \/>\n<meta property=\"og:description\" content=\"PERT diagrams show each task in a project as a node. Dependencies between tasks (for example, one task needs to be completed before another can be started) can be clearly shown through connections between task nodes. It also shows time information for each task, similar to the critical path approach (CPM), which determines the longest path for a project and thus the minimum time for the project to complete.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/\" \/>\n<meta property=\"og:site_name\" content=\"Media Maya\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-25T11:11:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-18T04:44:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png\" \/>\n<meta name=\"author\" content=\"vpadmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png\" \/>\n<meta name=\"twitter:creator\" content=\"@vpadmin\" \/>\n<meta name=\"twitter:label1\" content=\"Ditulis oleh\" \/>\n\t<meta name=\"twitter:data1\" content=\"vpadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/\"},\"author\":{\"name\":\"vpadmin\",\"@id\":\"https:\/\/www.cybermedian.com\/id\/#\/schema\/person\/0122cdf8fc3b73482dd8a30c8500f75a\"},\"headline\":\"Diagram PERT untuk Manajemen Proyek dengan Contoh Online\",\"datePublished\":\"2022-01-25T11:11:03+00:00\",\"dateModified\":\"2025-02-18T04:44:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/\"},\"wordCount\":575,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png\",\"keywords\":[\"cn-done\",\"es-done\",\"ja-done\",\"tw-done\"],\"articleSection\":[\"PMBOK - Project Management\"],\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/\",\"url\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/\",\"name\":\"Diagram PERT untuk Manajemen Proyek dengan Contoh Online - Media Maya\",\"isPartOf\":{\"@id\":\"https:\/\/www.cybermedian.com\/id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png\",\"datePublished\":\"2022-01-25T11:11:03+00:00\",\"dateModified\":\"2025-02-18T04:44:21+00:00\",\"author\":{\"@id\":\"https:\/\/www.cybermedian.com\/id\/#\/schema\/person\/0122cdf8fc3b73482dd8a30c8500f75a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#primaryimage\",\"url\":\"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png\",\"contentUrl\":\"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png\",\"width\":\"1074\",\"height\":\"517\",\"caption\":\"PERT Chart for Project Management with Online Examples\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.cybermedian.com\/id\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Diagram PERT untuk Manajemen Proyek dengan Contoh Online\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cybermedian.com\/id\/#website\",\"url\":\"https:\/\/www.cybermedian.com\/id\/\",\"name\":\"Media Maya\",\"description\":\"Belajar satu hal baru setiap hari\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.cybermedian.com\/id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cybermedian.com\/id\/#\/schema\/person\/0122cdf8fc3b73482dd8a30c8500f75a\",\"name\":\"vpadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/www.cybermedian.com\/id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3914788226b9b0af628488720662164f4641c6125d0bd38d90ae34f01c8c4ea3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3914788226b9b0af628488720662164f4641c6125d0bd38d90ae34f01c8c4ea3?s=96&d=mm&r=g\",\"caption\":\"vpadmin\"},\"sameAs\":[\"https:\/\/x.com\/vpadmin\"],\"url\":\"https:\/\/www.cybermedian.com\/id\/author\/vpadmin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Diagram PERT untuk Manajemen Proyek dengan Contoh Online - Media Maya","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/","og_locale":"id_ID","og_type":"article","og_title":"Diagram PERT untuk Manajemen Proyek dengan Contoh Online - Media Maya","og_description":"PERT diagrams show each task in a project as a node. Dependencies between tasks (for example, one task needs to be completed before another can be started) can be clearly shown through connections between task nodes. It also shows time information for each task, similar to the critical path approach (CPM), which determines the longest path for a project and thus the minimum time for the project to complete.","og_url":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/","og_site_name":"Media Maya","article_published_time":"2022-01-25T11:11:03+00:00","article_modified_time":"2025-02-18T04:44:21+00:00","og_image":[{"url":"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png","type":"","width":"","height":""}],"author":"vpadmin","twitter_card":"summary_large_image","twitter_image":"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png","twitter_creator":"@vpadmin","twitter_misc":{"Ditulis oleh":"vpadmin","Estimasi waktu membaca":"3 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#article","isPartOf":{"@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/"},"author":{"name":"vpadmin","@id":"https:\/\/www.cybermedian.com\/id\/#\/schema\/person\/0122cdf8fc3b73482dd8a30c8500f75a"},"headline":"Diagram PERT untuk Manajemen Proyek dengan Contoh Online","datePublished":"2022-01-25T11:11:03+00:00","dateModified":"2025-02-18T04:44:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/"},"wordCount":575,"commentCount":0,"image":{"@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#primaryimage"},"thumbnailUrl":"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png","keywords":["cn-done","es-done","ja-done","tw-done"],"articleSection":["PMBOK - Project Management"],"inLanguage":"id","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/","url":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/","name":"Diagram PERT untuk Manajemen Proyek dengan Contoh Online - Media Maya","isPartOf":{"@id":"https:\/\/www.cybermedian.com\/id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#primaryimage"},"image":{"@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#primaryimage"},"thumbnailUrl":"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png","datePublished":"2022-01-25T11:11:03+00:00","dateModified":"2025-02-18T04:44:21+00:00","author":{"@id":"https:\/\/www.cybermedian.com\/id\/#\/schema\/person\/0122cdf8fc3b73482dd8a30c8500f75a"},"breadcrumb":{"@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/"]}]},{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#primaryimage","url":"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png","contentUrl":"https:\/\/online.visual-paradigm.com\/images\/tutorials\/pert-chart-tutorial\/01-pert-chart-example.png","width":"1074","height":"517","caption":"PERT Chart for Project Management with Online Examples"},{"@type":"BreadcrumbList","@id":"https:\/\/www.cybermedian.com\/id\/pert-chart-for-project-management-with-online-examples\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cybermedian.com\/id\/"},{"@type":"ListItem","position":2,"name":"Diagram PERT untuk Manajemen Proyek dengan Contoh Online"}]},{"@type":"WebSite","@id":"https:\/\/www.cybermedian.com\/id\/#website","url":"https:\/\/www.cybermedian.com\/id\/","name":"Media Maya","description":"Belajar satu hal baru setiap hari","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cybermedian.com\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Person","@id":"https:\/\/www.cybermedian.com\/id\/#\/schema\/person\/0122cdf8fc3b73482dd8a30c8500f75a","name":"vpadmin","image":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/www.cybermedian.com\/id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3914788226b9b0af628488720662164f4641c6125d0bd38d90ae34f01c8c4ea3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3914788226b9b0af628488720662164f4641c6125d0bd38d90ae34f01c8c4ea3?s=96&d=mm&r=g","caption":"vpadmin"},"sameAs":["https:\/\/x.com\/vpadmin"],"url":"https:\/\/www.cybermedian.com\/id\/author\/vpadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/posts\/400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/comments?post=400"}],"version-history":[{"count":4,"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/posts\/400\/revisions"}],"predecessor-version":[{"id":10084,"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/posts\/400\/revisions\/10084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/media\/2453"}],"wp:attachment":[{"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/media?parent=400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/categories?post=400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cybermedian.com\/id\/wp-json\/wp\/v2\/tags?post=400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}