{"id":7378,"date":"2022-01-25T10:57:12","date_gmt":"2022-01-25T10:57:12","guid":{"rendered":"https:\/\/www.cybermedian.com\/es\/?p=7378"},"modified":"2026-04-20T09:13:42","modified_gmt":"2026-04-20T09:13:42","slug":"hagalo-usted-mismo-proceso-de-scrum-automatizado","status":"publish","type":"post","link":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/","title":{"rendered":"H\u00e1galo usted mismo Proceso de Scrum automatizado"},"content":{"rendered":"<figure id=\"041a\" class=\"graf graf--figure graf-after--h3\"><img decoding=\"async\" class=\"graf-image\" src=\"https:\/\/www.cybermedian.com\/es\/wp-content\/uploads\/sites\/8\/2022\/02\/0R852eZ9WrM4sbe7h.png\" data-image-id=\"0*R852eZ9WrM4sbe7h.png\" data-width=\"1170\" data-height=\"658\" data-is-featured=\"true\" \/><\/figure>\n<p id=\"2072\" class=\"graf graf--p graf-after--figure\">Agile es un enfoque iterativo para el desarrollo de productos de software.\u00a0Ayuda a los equipos de proyectos a entregar valor a sus clientes m\u00e1s r\u00e1pido y mejor.\u00a0Uno de los principios \u00e1giles clave es entregar el trabajo en una escala peque\u00f1a, comprobable y manejable.\u00a0En lugar de la identificaci\u00f3n de requisitos por adelantado, Agile enfatiza el descubrimiento e identificaci\u00f3n continuos de requisitos a lo largo de un proyecto.\u00a0Los equipos \u00e1giles pueden reaccionar al cambio de forma m\u00e1s r\u00e1pida y sencilla.<\/p>\n<h3 id=\"4148\" class=\"graf graf--h3 graf-after--p\"><span id=\"What_is_this_agile_tutorial_about\">\u00bfDe qu\u00e9 se trata este tutorial \u00e1gil?<\/span><\/h3>\n<p id=\"4679\" class=\"graf graf--p graf-after--h3\">Este es un tutorial paso a paso de Agile Scrum que lo ayuda a comprender el concepto central del desarrollo \u00e1gil, as\u00ed como la forma en que se puede ejecutar un proyecto \u00e1gil desde el principio hasta el final (es decir, la entrega del producto).\u00a0El software \u00e1gil\u00a0\u00a0<a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/features\/scrum-process-canvas\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/features\/scrum-process-canvas\/\">Scrum Process Canvas<\/a>\u00a0\u00a0se utilizar\u00e1 a lo largo de este tutorial.\u00a0Todo el tutorial de Agile Scrum cubrir\u00e1 varios temas \u00e1giles y se recomienda que los lectores lean este tutorial de Scrum para comprender completamente el flujo del desarrollo de proyectos \u00e1giles.<\/p>\n<figure id=\"b721\" class=\"graf graf--figure graf--iframe graf-after--p\"><\/figure>\n<h3 id=\"7941\" class=\"graf graf--h3 graf-after--figure\"><span id=\"Target_audience_of_agile_tutorial\">P\u00fablico objetivo del tutorial \u00e1gil<\/span><\/h3>\n<p id=\"7d02\" class=\"graf graf--p graf-after--h3\">Este tutorial \u00e1gil ha sido escrito para las dos personas a continuaci\u00f3n.<\/p>\n<ul class=\"postList\">\n<li id=\"08c9\" class=\"graf graf--li graf-after--p\">Personas que trabajan o trabajar\u00e1n en proyectos \u00e1giles, por ejemplo, todo tipo de desarrolladores de software, programadores, probadores, UXer, arquitectos, etc.<\/li>\n<li id=\"d243\" class=\"graf graf--li graf-after--li\">Jefes de proyecto y scrum masters<\/li>\n<li id=\"6e64\" class=\"graf graf--li graf-after--li\"><a class=\"markup--anchor markup--li-anchor\" href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-project-owner-role-in-scrum\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/scrum\/what-is-project-owner-role-in-scrum\/\">Propietarios de productos<\/a>\u00a0, analistas comerciales y representantes de clientes<\/li>\n<li id=\"a8b4\" class=\"graf graf--li graf-after--li\">Unidades que gobiernan los proyectos scrum<\/li>\n<\/ul>\n<h3 id=\"bf65\" class=\"graf graf--h3 graf-after--li\"><span id=\"Outline_of_agile_scrum_tutorial\">Esquema del tutorial \u00e1gil de scrum<\/span><\/h3>\n<p id=\"563c\" class=\"graf graf--p graf-after--h3\">Hay un total de veinte lecciones cubiertas en este tutorial \u00e1gil.\u00a0Haga clic en una conferencia para comenzar.<\/p>\n<p id=\"3b14\" class=\"graf graf--p graf-after--p\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 01 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-identify-project-vision\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-identify-project-vision\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo identificar la visi\u00f3n del proyecto<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"c9d5\" class=\"graf graf--li graf-after--p\">Identificar la visi\u00f3n del proyecto.<\/li>\n<li id=\"a889\" class=\"graf graf--li graf-after--li\">Desarrollar un estatuto de proyecto \u00e1gil<\/li>\n<\/ul>\n<p id=\"1736\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 02:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-appoint-product-owner\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-appoint-product-owner\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo designar al propietario del producto<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"bbe7\" class=\"graf graf--li graf-after--p\">Designar propietario del producto<\/li>\n<li id=\"52bc\" class=\"graf graf--li graf-after--li\">Detalle la responsabilidad del propietario del producto<\/li>\n<\/ul>\n<p id=\"a2dd\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 03 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-appoint-scrum-master\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-appoint-scrum-master\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo nombrar Scrum Master<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"9a6f\" class=\"graf graf--li graf-after--p\">Designar al maestro de scrum<\/li>\n<li id=\"4a13\" class=\"graf graf--li graf-after--li\">Detallar la responsabilidad del Scrum Master<\/li>\n<\/ul>\n<p id=\"b2d6\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 04 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-form-scrum-team\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-form-scrum-team\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo formar un equipo Scrum<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"e702\" class=\"graf graf--li graf-after--p\">Seleccionar miembros del equipo de scrum<\/li>\n<li id=\"818d\" class=\"graf graf--li graf-after--li\">Detalle las responsabilidades de los miembros del equipo Scrum<\/li>\n<\/ul>\n<p id=\"bb40\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 05:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-identify-scrum-project-stakeholders\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-identify-scrum-project-stakeholders\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo identificar a las partes interesadas del proyecto Scrum<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"644f\" class=\"graf graf--li graf-after--p\">Enumerar las partes interesadas del proyecto Scrum<\/li>\n<li id=\"8f2d\" class=\"graf graf--li graf-after--li\">Describir las partes interesadas<\/li>\n<\/ul>\n<p id=\"1bf7\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 06 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-identify-business-goals\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-identify-business-goals\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo identificar los objetivos comerciales<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"bfc2\" class=\"graf graf--li graf-after--p\">Dibujar diagrama de caso de uso<\/li>\n<li id=\"f29a\" class=\"graf graf--li graf-after--li\">Describir casos de uso<\/li>\n<\/ul>\n<p id=\"3e97\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 07 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-manage-epics\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-manage-epics\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo administrar \u00e9picas<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"f657\" class=\"graf graf--li graf-after--p\">Crear epopeyas en el mapa de historias de usuario<\/li>\n<li id=\"80fd\" class=\"graf graf--li graf-after--li\">describir epopeyas<\/li>\n<\/ul>\n<p id=\"fee6\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 08:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-manage-product-backlog\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-manage-product-backlog\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo administrar la acumulaci\u00f3n de productos<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"a7d8\" class=\"graf graf--li graf-after--p\">Describir los criterios de finalizaci\u00f3n del proyecto Scrum<\/li>\n<li id=\"1aa2\" class=\"graf graf--li graf-after--li\">Crear historias de usuario en story map<\/li>\n<li id=\"0526\" class=\"graf graf--li graf-after--li\">Definir\u00a0\u00a0<a class=\"markup--anchor markup--li-anchor\" href=\"https:\/\/www.visual-paradigm.com\/scrum\/definition-of-done-vs-acceptance-criteria\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/scrum\/definition-of-done-vs-acceptance-criteria\/\">criterios de aceptaci\u00f3n<\/a><\/li>\n<li id=\"87e7\" class=\"graf graf--li graf-after--li\">Priorizar historias de usuario<\/li>\n<\/ul>\n<p id=\"c560\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 09:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-develop-release-plan\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-develop-release-plan\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo desarrollar un plan de lanzamiento<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"863a\" class=\"graf graf--li graf-after--p\">Identificar y describir los entregables del proyecto.<\/li>\n<li id=\"2537\" class=\"graf graf--li graf-after--li\">Enumerar lanzamientos de proyectos<\/li>\n<li id=\"85ef\" class=\"graf graf--li graf-after--li\">Reorganizar las historias de usuario en lanzamientos<\/li>\n<\/ul>\n<p id=\"da13\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 10:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-create-sprint\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-create-sprint\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo crear un Sprint<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"9603\" class=\"graf graf--li graf-after--p\">crear un sprint<\/li>\n<li id=\"cc2e\" class=\"graf graf--li graf-after--li\">Configurar sprint<\/li>\n<\/ul>\n<p id=\"13b9\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 11:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-sprint-planning-meeting\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-sprint-planning-meeting\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo realizar una reuni\u00f3n de planificaci\u00f3n de Sprint<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"25a6\" class=\"graf graf--li graf-after--p\">Seleccionar historias de usuario para la acumulaci\u00f3n de sprint<\/li>\n<li id=\"b2da\" class=\"graf graf--li graf-after--li\">Identificar tareas de esfuerzo estimado<\/li>\n<li id=\"5423\" class=\"graf graf--li graf-after--li\">Identificar los entregables del sprint<\/li>\n<\/ul>\n<p id=\"dfb6\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 12 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-record-impediment\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-record-impediment\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo registrar un impedimento<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"a670\" class=\"graf graf--li graf-after--p\">Registro de impedimento<\/li>\n<li id=\"d1e5\" class=\"graf graf--li graf-after--li\">detalle impedimento<\/li>\n<\/ul>\n<p id=\"3384\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 13:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-create-a-burndown-chart\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-create-a-burndown-chart\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo crear un gr\u00e1fico de evoluci\u00f3n<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"5fff\" class=\"graf graf--li graf-after--p\">Comprender el gr\u00e1fico de trabajo pendiente<\/li>\n<li id=\"57a8\" class=\"graf graf--li graf-after--li\">Abrir gr\u00e1fico de trabajo pendiente<\/li>\n<\/ul>\n<p id=\"675c\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 14:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-create-a-scrum-board\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-create-a-scrum-board\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo crear un tablero Scrum<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"b07a\" class=\"graf graf--li graf-after--p\">Comprender el tablero de scrum<\/li>\n<li id=\"e55a\" class=\"graf graf--li graf-after--li\">tablero de scrum abierto<\/li>\n<\/ul>\n<p id=\"9f53\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 15 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-daily-scrum\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-daily-scrum\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo realizar Scrum diario<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"5b67\" class=\"graf graf--li graf-after--p\">Registrar el progreso del trabajo<\/li>\n<li id=\"f433\" class=\"graf graf--li graf-after--li\">Realizar scrum diario<\/li>\n<li id=\"4c0c\" class=\"graf graf--li graf-after--li\">Registrar actividades de seguimiento<\/li>\n<\/ul>\n<p id=\"8da1\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 16:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-sprint-review\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-sprint-review\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo realizar una revisi\u00f3n de Sprint<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"7a7f\" class=\"graf graf--li graf-after--p\">Demostrar historias de usuario<\/li>\n<li id=\"0a0f\" class=\"graf graf--li graf-after--li\">Realizar la aceptaci\u00f3n de la historia de usuario<\/li>\n<li id=\"40ee\" class=\"graf graf--li graf-after--li\">Actualizar el progreso de los entregables del proyecto<\/li>\n<\/ul>\n<p id=\"9183\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 17:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-sprint-retrospective\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-sprint-retrospective\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo realizar una retrospectiva de Sprint<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"be15\" class=\"graf graf--li graf-after--p\">Registrar elementos de inicio, continuaci\u00f3n y parada<\/li>\n<li id=\"28f9\" class=\"graf graf--li graf-after--li\">Votar y registrar el resultado de la votaci\u00f3n<\/li>\n<\/ul>\n<p id=\"60e7\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 18 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-project-retrospective\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-conduct-project-retrospective\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo llevar a cabo una retrospectiva del proyecto<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"4059\" class=\"graf graf--li graf-after--p\">Documentar las lecciones aprendidas: \u00e9xitos del proyecto<\/li>\n<li id=\"d9bb\" class=\"graf graf--li graf-after--li\">Documentar los desaf\u00edos del proyecto<\/li>\n<\/ul>\n<p id=\"a7cf\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 19:\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-generate-report-for-scrum-project\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-generate-report-for-scrum-project\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo generar un informe para el proyecto Scrum<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"d8e4\" class=\"graf graf--li graf-after--p\">Abrir un informe generado autom\u00e1ticamente<\/li>\n<li id=\"5548\" class=\"graf graf--li graf-after--li\">Generaci\u00f3n manual de informes<\/li>\n<\/ul>\n<p id=\"4e05\" class=\"graf graf--p graf-after--li\"><strong class=\"markup--strong markup--p-strong\">Lecci\u00f3n 20 \u2014\u200a\u00a0<\/strong><a class=\"markup--anchor markup--p-anchor\" href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-use-artifact-shortcut\/\" target=\"_blank\" rel=\"noopener\" data-href=\"https:\/\/www.visual-paradigm.com\/tutorials\/agile-tutorial\/how-to-use-artifact-shortcut\/\"><strong class=\"markup--strong markup--p-strong\">C\u00f3mo usar el atajo de artefacto<\/strong><\/a><\/p>\n<ul class=\"postList\">\n<li id=\"70c9\" class=\"graf graf--li graf-after--p graf--trailing\">Abrir artefacto a trav\u00e9s de acceso directo<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Navegue sin problemas por todo el proceso de scrum en un \u00fanico lienzo de proceso de scrum bellamente dise\u00f1ado. Realice las actividades de scrum de forma r\u00e1pida, sencilla y sin problemas. Mantenga a todo el equipo plenamente comprometido. Nuestro software \u00e1gil hace que los proyectos \u00e1giles sean sencillos y eficaces.<\/p>\n","protected":false},"author":3,"featured_media":7381,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-7378","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-scrum"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>H\u00e1galo usted mismo Proceso de Scrum automatizado - Cibermedio<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"H\u00e1galo usted mismo Proceso de Scrum automatizado - Cibermedio\" \/>\n<meta property=\"og:description\" content=\"Navegue sin problemas por todo el proceso de scrum en un \u00fanico lienzo de proceso de scrum bellamente dise\u00f1ado. Realice las actividades de scrum de forma r\u00e1pida, sencilla y sin problemas. Mantenga a todo el equipo plenamente comprometido. Nuestro software \u00e1gil hace que los proyectos \u00e1giles sean sencillos y eficaces.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/\" \/>\n<meta property=\"og:site_name\" content=\"Cibermedio\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-25T10:57:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-20T09:13:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png\" \/>\n<meta name=\"author\" content=\"vpvera\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"vpvera\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/\"},\"author\":{\"name\":\"vpvera\",\"@id\":\"https:\/\/www.cybermedian.com\/es\/#\/schema\/person\/54a5a46528997d1917d55add9b0de7d5\"},\"headline\":\"H\u00e1galo usted mismo Proceso de Scrum automatizado\",\"datePublished\":\"2022-01-25T10:57:12+00:00\",\"dateModified\":\"2026-04-20T09:13:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/\"},\"wordCount\":720,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png\",\"articleSection\":[\"Scrum\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/\",\"url\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/\",\"name\":\"H\u00e1galo usted mismo Proceso de Scrum automatizado - Cibermedio\",\"isPartOf\":{\"@id\":\"https:\/\/www.cybermedian.com\/es\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png\",\"datePublished\":\"2022-01-25T10:57:12+00:00\",\"dateModified\":\"2026-04-20T09:13:42+00:00\",\"author\":{\"@id\":\"https:\/\/www.cybermedian.com\/es\/#\/schema\/person\/54a5a46528997d1917d55add9b0de7d5\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#primaryimage\",\"url\":\"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png\",\"contentUrl\":\"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png\",\"width\":\"1170\",\"height\":\"658\",\"caption\":\"H\u00e1galo usted mismo Proceso de Scrum automatizado\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.cybermedian.com\/es\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"H\u00e1galo usted mismo Proceso de Scrum automatizado\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cybermedian.com\/es\/#website\",\"url\":\"https:\/\/www.cybermedian.com\/es\/\",\"name\":\"Cibermedio\",\"description\":\"Aprendiendo una cosa nueva todos los d\u00edas\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.cybermedian.com\/es\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cybermedian.com\/es\/#\/schema\/person\/54a5a46528997d1917d55add9b0de7d5\",\"name\":\"vpvera\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.cybermedian.com\/es\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/308f3b229618b77cd1764bf92dc496296ea49a0db7c1c881fa7c4f063b2b58da?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/308f3b229618b77cd1764bf92dc496296ea49a0db7c1c881fa7c4f063b2b58da?s=96&d=mm&r=g\",\"caption\":\"vpvera\"},\"url\":\"https:\/\/www.cybermedian.com\/es\/author\/vpvera\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"H\u00e1galo usted mismo Proceso de Scrum automatizado - Cibermedio","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/","og_locale":"es_ES","og_type":"article","og_title":"H\u00e1galo usted mismo Proceso de Scrum automatizado - Cibermedio","og_description":"Navegue sin problemas por todo el proceso de scrum en un \u00fanico lienzo de proceso de scrum bellamente dise\u00f1ado. Realice las actividades de scrum de forma r\u00e1pida, sencilla y sin problemas. Mantenga a todo el equipo plenamente comprometido. Nuestro software \u00e1gil hace que los proyectos \u00e1giles sean sencillos y eficaces.","og_url":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/","og_site_name":"Cibermedio","article_published_time":"2022-01-25T10:57:12+00:00","article_modified_time":"2026-04-20T09:13:42+00:00","og_image":[{"url":"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png","type":"","width":"","height":""}],"author":"vpvera","twitter_card":"summary_large_image","twitter_image":"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png","twitter_misc":{"Escrito por":"vpvera","Tiempo de lectura":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#article","isPartOf":{"@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/"},"author":{"name":"vpvera","@id":"https:\/\/www.cybermedian.com\/es\/#\/schema\/person\/54a5a46528997d1917d55add9b0de7d5"},"headline":"H\u00e1galo usted mismo Proceso de Scrum automatizado","datePublished":"2022-01-25T10:57:12+00:00","dateModified":"2026-04-20T09:13:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/"},"wordCount":720,"commentCount":0,"image":{"@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png","articleSection":["Scrum"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/","url":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/","name":"H\u00e1galo usted mismo Proceso de Scrum automatizado - Cibermedio","isPartOf":{"@id":"https:\/\/www.cybermedian.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#primaryimage"},"image":{"@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png","datePublished":"2022-01-25T10:57:12+00:00","dateModified":"2026-04-20T09:13:42+00:00","author":{"@id":"https:\/\/www.cybermedian.com\/es\/#\/schema\/person\/54a5a46528997d1917d55add9b0de7d5"},"breadcrumb":{"@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#primaryimage","url":"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png","contentUrl":"https:\/\/cdn-images.visual-paradigm.com\/features\/v15\/1\/scrum-process-canvas\/scrum-process-canvas.png","width":"1170","height":"658","caption":"H\u00e1galo usted mismo Proceso de Scrum automatizado"},{"@type":"BreadcrumbList","@id":"https:\/\/www.cybermedian.com\/es\/do-it-yourself-automated-scrum-process\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cybermedian.com\/es\/"},{"@type":"ListItem","position":2,"name":"H\u00e1galo usted mismo Proceso de Scrum automatizado"}]},{"@type":"WebSite","@id":"https:\/\/www.cybermedian.com\/es\/#website","url":"https:\/\/www.cybermedian.com\/es\/","name":"Cibermedio","description":"Aprendiendo una cosa nueva todos los d\u00edas","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cybermedian.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/www.cybermedian.com\/es\/#\/schema\/person\/54a5a46528997d1917d55add9b0de7d5","name":"vpvera","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.cybermedian.com\/es\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/308f3b229618b77cd1764bf92dc496296ea49a0db7c1c881fa7c4f063b2b58da?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/308f3b229618b77cd1764bf92dc496296ea49a0db7c1c881fa7c4f063b2b58da?s=96&d=mm&r=g","caption":"vpvera"},"url":"https:\/\/www.cybermedian.com\/es\/author\/vpvera\/"}]}},"_links":{"self":[{"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/posts\/7378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/comments?post=7378"}],"version-history":[{"count":3,"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/posts\/7378\/revisions"}],"predecessor-version":[{"id":7382,"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/posts\/7378\/revisions\/7382"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/media\/7381"}],"wp:attachment":[{"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/media?parent=7378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/categories?post=7378"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cybermedian.com\/es\/wp-json\/wp\/v2\/tags?post=7378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}